On 6 and 7th of July 2018, PowerDrilindo togerher with Sandvik Indonesia are commissioning at the site of PT Perkasa Inkakerta (PIK) in Bengalon, East Kutai, East Borneo, Indonesia. This trip can be reached by driving for 12 hours from Balikpapan City with the distance of 371.2 Km.